Pressurisation in high-rise buildings is a niche but critical topic. Proper commissioning is essential, as a building cannot be handed over without it. The Building Safety Act has significantly changed the industry’s approach, making it essential for everyone involved to ensure they have the right information when considering smoke clearance or pressurisation systems.
Radek emphasises that pressurisation systems are crucial for fire safety, providing optimal conditions for evacuees and firefighters. These systems are widely used globally but face challenges in the UK, which must be addressed to ensure proper functionality.
Qualified Building Services Designer, specialising in differential pressure systems. Provides support to international designers.
She works at Smay as the Head of the Research and CFD Analysis Department. In 2020, she obtained a PhD in Engineering and Technical Sciences from the Warsaw University of Technology. A graduate of the postgraduate studies "Building Smoke Control Systems – Fire Ventilation," conducted at the Warsaw University of Technology, she has also been a lecturer in these studies since 2016. Izabela specialises in performing numerical analyses and testing various fire ventilation systems.
